Specific room acoustics, noise control, and audio/video systems recommendations in tandem with seismic modifications to this historic building, which was originally built in 1875. The project included new and renovated program space below the Tabernacle, and the incorporation of a new motorized platform / lift system. The magnificent 5-manual, 11,623-pipe, 206-rank Tabernacle organ accompanies the 325-member Tabernacle Choir in the space.
Project Details
Audiovisual Systems Design
Mechanical Noise Control
Room Acoustics Design
Sound Isolation
FFKR Architects, Architect, Salt Lake City, UT
Auerbach Pollock Friedlander, Theatre Consultants, San Francisco, CA
Salt Lake City
UT